Hurricane repairs- March 2017

In March, we were able to complete some much-needed repairs. The Dock House, which was sand-blasted by Hurricane Matthew in Oct 2016, was painted, outside stairs were stabilized, and a new porch floor was added. A new low flush toilet was also a welcomed addition. Repair of leaks above the kitchen window in the lab involved replacing the window awning of the quonset hut… a big job! Thanks Clyde, Ryan, Lewis, Anishka and Cayden!