A much needed dinghy dock was built by Wendall Mckenzie and family in early June. The main Darby dock is very high and not suitable for loading and unloading from small boats.. the new dock is magnificent! Thanks Wendall Then in late June, the solar system in the lab was upgraded by the addition of a new set of ground mounted solar panels. Thanks to Ledger Kellier and Paul Ferren of the Energy Store for this installation, which provides much needed power to run the lab.